Peak Construction at Massanutten Resort

APR Associates Architects has worked with Peak Construction and Massanutten Resort since 2001. Over the years APR has consulted on over one hundred and thirty five projects, sixty percent of which were completed. The projects all varied in size, scope of work, and building type. Below are some highlighted projects from over the many years of working with Peak Construction at Massanutten Resort both completed projects and conceptual projects.

 

Peak Village Festival

Village Festival, a proposed commercial development, was planned to be situated at the main entrance of Massanutten Resort in Rockingham County, Virginia. Created to offer a unique shopping experience with a variety of shops and services scattered throughout a park-like environment in small clusters or connected by convenient circulation routes. Designed to avoid the "strip mall" look the buildings and landscape incorporate a walk through layout with multiple entrances and interconnecting walks to create a pleasant experience throughout the Village. Centrally located to the festival is large park that includes ponds, fountains, bike paths and a small amphitheater to enhance the total shopping experience.

APR-2436bikepath.jpg
 

MASSANUTTEN RESORT CASA & LUXURY TIMESHARES AT WOODSTONE MEADOWS

For the Woodstone Meadows area at Massanutten Resort two different but coordinating style buildings were designed to be mixed throughout the surrounding golf course. Originally the resort was only building and marketing two story townhomes, APR Associates suggested designing condos in a three story building instead which allowed the resort be able to sell and build more untis per acre. APR Associates worked with engineers to layout this forty-five building and growing subdivision.

IMG_0313-1.jpg
Peak Casa Front.jpg
Peak Luxury Front.jpg
 
100_4349.jpg

Golf Pro Shop Building and The Spa at Massanutten

Often times clients come to APR Associates needing assistance on multiple building projects at once. Massanutten Resort required the addition of one building and changes to two existing buildings to accommodate the needs and desires of the resort quests. An existing building closer to the golf course was converted into the new Golf Pro Shop building and a golf cart storage building was added as a support space to the pro shop. The former Golf Pro Shop building was transformed into The Spa at Massanutten.

The commercial portfolio section has more project photos.

100_4356.jpg
 

Platinum Timeshares

Massanutten Resort has multiple levels of timeshares that are consturcted and sold. This timeshare concept was designed and detailed to be the highest level available above the current top level. Due to the changing market, the resort chose to focus on selling another style timeshare instead. These timeshares have not been built and the project has been put on hold.

Exteriorsketch0006+copy.jpg
Hallway.jpg
Living+room.jpg
bathroomTV1352+copy.jpg
 

Activity Center

Initially, the design concept for this project was a mixed-use facility approximately 32,000 square feet. The main floor was designed for a 1300 seat auditorium that could potentially be modified to accommodate 528 seats at banquet tables or divided into three special use areas. Additionally, the lower floor includes specially designed areas for resort activities and extra storage. The project evolved into a smaller performance center. This project was never built.

PEAKCTR002.jpg
 

Snow Tube & Zip Line Building

The commercial portfolio section has more project photos.

IMG_0524.jpg
IMG_0518.jpg
IMG_0516.JPG
 

Snow Sports Learning Center

The commercial portfolio section has more project photos.

The snow sports program had significantly outgrown their space, originally located in the main floor of the ski lodge in approximately 5,500 square feet. APR Associates analyzed the current snow sports program and created a design for a new 15,000 square foot three part building to accommodate the growing program. The Snow Sports Learning Center includes a main building used for year round activities at the resort, a two story instructor building also used for year round equipment storage, and a covered bridge connector that connects the two buildings and spans over the existing creek giving the main building access to the ski slopes.

IMG_4997.JPG
Ski School Rendering.jpg
Entry+Elevation.jpg
 

Base Camp Umbrella Bar

The hospitality portfolio section has completed project photos.

Deck+Rendering+4x8.jpg
 

DELUXE DELUXE Timeshares

This project design was based on other existing timeshare units with upgrades to certain areas the cleint felt would make them more markatable. These timeshares were designed and detailed based on the needs of the market at the time. As this project developed the market started to grow into another direction and as a result this project was never built.

Peak Deluxe Deluxe Timeshares-1.jpg
Peak Timeshares-2.jpg
Peak Timeshares-3.jpg
Peak Timeshares-4.jpg
 

Campfire GRill Restaurant

This project involved renovations and modifications to the exterior and interior of an existing restaurant.

headerimage_campfire-grill-header__1 (1).jpg

To learn more about the overall design process for this project read our blog

The hospitality portfolio section has more photos.

 

Water park Addition & Umbrella Bar

To accommodate the four new waterslides being added to the existing water park at Massanutten Resort, APR Associates facilitated with designing the support building that houses all the mechanical and electrical equipment to operate and maintain the new waterslides. The building also includes additional restrooms and a lifeguard breakroom. An umbrella bar area is designed to be part of the waterpark slide addition, but has not yet been installed. Additionally, APR Associates assisted Peak Construction during the duration of the construction phase to manage and coordinate not only the building construction but the waterslide construction. Below are progress photos of a project still under construction.

vmatxsloak_2372749478031-1-IMG9577551(1).jpg
vmatxsloak_2372749478031-2-IMG9577531%281%29.jpg
entrance-to-massanutten.jpg

COMPLETE LIST OF PROJECT

Peak ADA Upgrades - Eagle Trace Units

Peak ADA Upgrades - Shenandoah Villas

Peak ADA Upgrades - Summit Condos

Peak ADA Upgrades - Woodstone Condos

Peak Activity Center

Peak ADA Restroom

Peak Amphitheater

Peak Brewery Restaurant

Peak Bus Barn

Peak Campfire Grill Restaurant

Peak Campfire Grill Restaurant Sign

Peak Canoe Rental Office

Peak Casa & Lux Foundation Changes

Peak Casa Circulation Pump Pad

Peak Casa Cluster 10

Peak Casa Cluster 11

Peak Casa Cluster 12

Peak Casa Cluster 12 Kitchen Revisions

Peak Casa II Feasibility Study

Peak Casa Modification

Peak Casa Redesign

Peak Casa Timeshares

Peak Casa Water Heater Revisions

Peak Cluster 9 Casas

Peak Cluster 9 Luxuries

Peak Concert Stage

Peak Condos

Peak Conference Center

Peak Conference Center Modifications

Peak Construction Conference Center

Peak Construction Master Plan

Peak Daycare

Peak Daycare Renovations

Peak Daycare Kitchen Hood

Peak Deluxe Deluxe Timeshares

Peak Entry Sign

Peak Exterior Steps Investigation

Peak Family Adventure Park Storage

Peak Fareways Consult.

Peak Fareways HVAC Upgrade

Peak Fareways Rated Floor System

Peak Fareways Restaurant Deck

Peak Golf Cart Barn

Peak Golf Course & Cart Maintenance (Housekeeping)

Peak Golf Pro Shop

Peak Hess Stair Study

Peak Hopkins Rental House

Peak Hotel Consultation

Peak Hotels Estimate

Peak Housekeeping

Peak Infill Repair

Peak Laundry

Peak LeClub Spa Modifications

Peak Lux Lux Code Study Update

Peak Luxury Luxury – 2 Ft.

Peak Luxury Luxury – 4 Ft.

Peak Luxury Luxury – Level

Peak Luxury Luxury Attic & Crawl Space Dry System Removal

Peak Luxury Oven/Stove/Microwave

Peak Luxury Timeshares Redesign

Peak Luxury Water Heater

Peak Luxury/Luxury Timeshares

Peak Maintenance Building

Peak Maintenance Building Modifications

Peak Market

Peak Market Modifications

Peak Nelson Barn Conversion

Peak Off Season Activities - Slope Sliders

Peak Performance Center

Peak Performance Center – Connector

Peak Performance Center – Elevator

Peak Performance Center – MEP

Peak Performance Center – Site Plans Development

Peak Performance Center – Stage

Peak Performance Center – Structural

Peak Performance Center – 1200 Seat Single Story Version

Peak Performance Center – 800 Seat Single Story Version

Peak Performance Center – Basement and Related 1200 Seat Version

Peak Performance Center – Basement and Related 800 Seat Version

Peak Platinum Timeshares

Peak Platinum Timeshares Redesign

Peak Platinum Units

Peak Polansky Residence

Peak Pool House

Peak Presidential Resort - New Deck

Peak Pro Shop - Daycare

Peak Pro Shop Restrooms

Peak Regal Vista 2009 IRC Code Study

Peak Regal Vista 2012 IRC Code Study

Peak Regal Vista Study

Peak Restaurant

Peak Salt Bins

Peak Sandridge

Peak Ski Area Activities Building

Peak Ski Lodge ADA Restrooms

Peak Ski Lodge Addition

Peak Ski Lodge Elevator

Peak Ski Lodge Expansion

Peak Ski Lodge Food Services and Ski Patrol Additions

Peak Ski Lodge Main Floor Renovations

Peak Ski Lodge Renovations and Modifications

Peak Ski Lodge Residing

Peak Ski Lodge Smoking Dock

Peak Ski Lodge Structural Analysis

Peak Ski Rental Addition

Peak Skier Drop Off

Peak Snow Tube & Zip Line Building

Peak Spa Porch Roof Addition

Peak Spa Renovation

Peak Sports Learning Center

Peak Springston Regal Vistas

Peak Store

Peak The Pottery

Peak Timeshare Attic Draft Stopping

Peak Turkey Barn Feasibility Study

Peak Turkey Barn 1 – Warehouse

Peak Turkey Barn 2 – Golf Maintenance

Peak Turkey Barn 3 – Activities

Peak Virginia BBQ

Peak Virginia BBQ - New Concept

Peak Village Center

Peak Village Festival

Peak Visitors Center

Peak Water Park Renovations

Peak Water Park Bar

Peak Water Park Shower Modifications

Peak Water Park Addition

Peak Wilderness Lodge – Glass Wall Restoration

Peak Woodstone Kid Rec Expansion

Peak Woodstone Center Entry Concept

Peak Woodstone Front Desk Check-In

Peak Woodstone Stair Deletion